Content

Seeing is believing!

You found this company profile listed on Global Catalog, so we’re confident buyers WILL find your business, too. All you need to do is sign up!

You will be seen for FREE by thousands of active buyers from across the globe, searching Global Catalog every day for companies just like yours.

TZ1600-35 2-Sides 2-Coatings Aluminium Production Line (Separated)

プロファイリングシェイパー

要求に応じて

新しい

利用できない

利用できない

問い合わせる

製品記述

TZ1600-35 2-Sides 2-Coatings Aluminium Production Line (Separated)

Coating line features:

Model TZ1600-35 coating line (separated structure) is suitable for certain coating factories. 2-sides 2-coating coating products in thickness range 0.15mm~0.6mm applies to most ACP material, roofing and ceiling material. Model TZ1600-35 coating line is high quality coating line, good performance in all kinds of paint coating. Separated structure is flexible in production, pretreatment process and coating process are separated and non-interfering, so that production is much easier to plan or schedule. Operation faults and equipment problems effect is less.

A primary reason to choose separated structure is its advantage over dimension, Model TZ1600-35 requires only 85m×18m×7m workshop.

Application: For coating aluminium coil of ACP(Aluminium Composite Panel), roofing , cladding, ceiling,roller shutter,etc.

Advantage: Widely usage range, short line, smaller dimension workshop needed,  less operation faults and equipment problems effect .

1. Main parameters of coating line

Material parameter

Thickness: 0.15~0.6mm

Width: 1600mm

Outer diameter OD(max): Φ1500mm

Inner diameter: Φ405mm

Bobbin material: Steel or paper

Inverval-layers deviation tolerance: ≤0.8 mm (Excluding the bottom 5 layers and exterior 2 layers)

Coil over-all deviation tolerance: ≤2 mm (Excluding the bottom 5 layers and exterior 2 layers)

Coating thickness: Dry film thickness: 8~20 um

 

Product Weight: Max 5000kg(Excluding bobbin)

 

CCL Processing Speed: 35 m/min (Speed benchmark: thickness 0.25mm coil exclude PVDF coating)

 

Heating Energy Source: LNG, LPG

 

Roller coating Process: Continuous 2 sides 2 coating & 2 baking

 

Properties and features:

Roller width: 1800mm

Coils feeding centering adjustment : ±75mm

Threading speed: 5~15m/min(Adjustable)

Line maximum speed: 35m/min

Line speed accuracy: Steady Speed, ±0.1%; Acceleration, ±0.4%

Uncoiling tension range: 160~800kgf

Processing tension range: 160~800kgf

Coiling tension range: 320~1400kgf

Tension accuracy: Steady Speed, ±1.0%; Acceleration, ±2.0%

Line space dimensions: 76000mm×1000mm×6500mm

Heating Energy Source: LNG, LPG

 

2. Basic Production Process

Coating line

Coil loading → Uncoil machine → Sewing table → Topside primer-paint roller-coater → Curing oven 1 → Air cooling → CPC 1 → Tension device 1 →Topside 2-coat and backside roller-coater → Curing oven 2 → CPC 2 → Tension device 2 → Coil machiner → Coil discharging

 

Pretreatment line

Coil loading → Uncoil machine → Sewing table → Acid washing, brushing roller → Water washing → Deionized water washing → Drying → Roller-coating chromizing → Drying → Cooling → Tension device → Coil machine → Coil discharging

 

Rewinding line

Coil loading → Uncoil machine → Sewing table → Tension device → Coil machine → Coil discharging

 

3. Main devices list

Name Quantity

Uncoil machine 3

Sewing table 3

Tension Device 4

Redirection steel roller 11

Brushing roller 2

Degrease pool 3

Water washing pool 2

Drying device 2

Squeeze roller 5

Roller-coating chromizing coater 1

Coater 2

Curing oven 2

Heat system 2

Air cooling system 4

Film device 1

Coil machine 3

CPC 2

EPC 3

Steel frame 1

Electrical system 3

*Optional configuration: waste gas treatment and energy recycle system

 

4. Water and power consumption of coating line

Total power consumption: 600KW

Compressed air: Min5.5bar,1Nm3/min,actual consumption

Water: Deionized water, supply quantity is about 4T/h

Heating fuel: LPG or LNG

LPG consumption: 0.6 CBM/min

LNG consumption: 1 CBM/min

5.The coating line design and manufacture leads 100 days, installation and testing leads 60 days.

6.Trade terms: FOB, CIF are available

7.Payment terms: T/T, D/P, LC are acceptable

8. Packing style: Wooden pallet

9. Transportation: by sea