• No. 228 North of Jianshe Street
  • Shijiazhuang, Hebei, 050000
  • Kina
  • Tel:+8618630189634
  • Skype:haosenyao
  • Url:

3D panel production line

Građevinski materijal Strojevi za izradu

NA ZAHTJEV

Novi

1 Godina (e)

Kina

Raspitati se

Opis proizvoda

Do you supply turn key project?

Yes.Usually we supply turn-key project, we’ll dispatch engineer to go there for guiding the assembling and training

Workers until your factory runs normally.

How long will it take for manufacturing the full 3D panel production line?

50-60 days. Because in the manufacturing process, we must make heat treatment for the steel to guarantee the high service life.


Uvoz / izvoz

1.00 Set

Besplatno Na brodu, Troškovi i tereta, Troškovi, osiguranje i vozarina

T/T, L/C