3D panel production line
Deskripsi Produk
Do you supply turn key project?
Yes.Usually we supply turn-key project, we’ll dispatch engineer to go there for guiding the assembling and training
Workers until your factory runs normally.
How long will it take for manufacturing the full 3D panel production line?
50-60 days. Because in the manufacturing process, we must make heat treatment for the steel to guarantee the high service life.
Impor / ekspor
1.00 Set
Free On papan, Biaya dan angkutan, Biaya, asuransi dan pengiriman
T/T, L/C