• No. 228 North of Jianshe Street
  • Shijiazhuang, 河北, 050000
  • 中国
  • 電話:+8618630189634
  • Skype公司:haosenyao
  • 網址:

3D panel production line

建材机械制造

根據要求

1 年份(S)

中国

查詢

產品說明

Do you supply turn key project?

Yes.Usually we supply turn-key project, we’ll dispatch engineer to go there for guiding the assembling and training

Workers until your factory runs normally.

How long will it take for manufacturing the full 3D panel production line?

50-60 days. Because in the manufacturing process, we must make heat treatment for the steel to guarantee the high service life.


導入/導出

1.00

船上交货(……指定装运港), 成本加运费(……指定目的港), 成本、保险费加运费付至(……指定目的港)

T/T, L/C